Queens Wharf concrete repair for 2011 Rugby World Cup

“What impressed me most was the consistency with which Contech performed. The team delivered exactly as they said they would, but ahead of time and with a larger scope than we originally set out to achieve, all the while working around and with two other contractors on site. Delivering possibly the highest-volume repair project in New Zealand and in such a short timeframe made for a very impressive performance.”