SH2 Waioeka Gorge bridge strengthening

“The strengthening of the five bridges in this project was an important one for Waka Kotahi due to the relatively remote site location and the high number of heavy commercial vehicles that use SH2. The alternative design developed by Contech offered significant savings to Waka Kotahi while meeting the original design intent. During the delivery of the project, the team further identified a number of opportunities to reduce the duration and impact of the project on road users. As a result the work was completed well ahead of the expected schedule, delivering an excellent outcome for all involved.”