LATEST NEWS

- 1/6/2016

BBR Connaect 2016 Magazine

The BBR Network's annual magazine - Connaect - is celebrating its tenth birthday this year. BBR Contech activities feature strongly again in this showcase of projects from around the world.

- 06/05/2015

BBR Connaect 2015 Magazine

The 2015 edition of the international BBR Connaect magazine showcases recent NZ and international projects. The theme of this edition is excellence in customer service.....

- 01/12/2014

Sika FRP CodeMark Certification

Sika NZ and BBR Contech are pleased to announce that they have obtained CodeMark Product Certification for SikaWrap Hex FRP

See more news >

Case studies

The Warehouse SIDC Extension, Izone Park, Rolleston

Date: May - December 2016
Client: The Warehouse Group
Structural Engineer Holmes Consulting Group
Main Contractor Naylor Love Construction
PT Subcontractor BBR Contech

The Warehouse Ltd $13 million-dollar expansion of their South Island Distribution Centre in Rolleston, Christchurch increases the capacity of the already impressive structure from 34,000 sqm of floor space to 49,000sqm plus an additional 2000sqm of container truck loading canopy.

Construction Techniques Ltd was engaged as the post tensioning specialist and once again teamed up with Naylor Love providing experience and technical expertise to deliver a quality Post Tensioned floor to match the existing 34,000sqm of PT floors constructed back in 2002.

Using BBR CONA 405 flat anchorages, 67MT of tensioning strand was installed through 21,000LM of flat duct tendons. A total of six large slabs were installed, tensioned and grouted in a 3-month period.

Key Services: Post Tensioned Slab
< ALL CASE STUDIES

BBR Contech stays at the forefront of technology and maintains a high level of industry participation by membership and affiliations with the following organisations: