61 Kilmore Street, CBD Christchurch, FRP

Originally constructed in 1982 the three-level inner city commercial/office building was stripped back to its concrete and steel frame and rebuilt to 100% of the new building code post earthquake.

Moon Gate Strengthening, Aidanfield, Christchurch

The Moon Gate was constructed on the school site circa 1935. The Christchurch earthquake had caused minor damage to the wall and the current owners were keen to retain it as a link to the past.

The ‘Cardboard Cathedral’, Christchurch

You won’t find many new cathedrals built for just $5 million these days, but in Christchurch they’ve done just that – and earned widespread acclaim to boot.

Cardinal Logistics Warehouse, Wiri, South Auckland

A tight timeframe – and therefore the presence of a lot of other contractors on site – made this job a logistical challenge for the BBR Contech team. However, efficient planning and good relationships got it done on time, which means Cardinal Logistics is on track to move in soon to its new warehouse in Wiri.

BBR Contech stays at the forefront of technology and maintains a high level of industry participation by membership and affiliations with the following organisations: