Case studies

Arts Centre Great Hall, CBD Christchurch

As part of the $290M extensive restoration project at one of New Zealand’s most significant collection of heritage buildings, BBR Contech was nominated as the specialist seismic retrofit contractor working tirelessly alongside the Arts Centre Group, Fletcher Construction and Holmes Consulting Group to restore the magnificent Great Hall structure.

Online Distribution, Woolston, Christchurch

Further development at Portlink Industrial Park sees the inclusion of two additional warehouses for Principal, Online Distribution Ltd. Engineered by Aecom, Conslab were engaged to provide the concrete floor slabs and in turn BBR Contech were engaged as the PT specialist to design and install two high ware slabs on grade.

CJESP – Services Tunnel, CBD, Christchurch

The Christchurch Justice and Emergency Services Precinct brings together all justice and emergency services in one purpose-built, leading-edge precinct in central Christchurch.

Underslab Grouting

Since the Seismic events of 2010/2011 and beyond, BBR Contech have developed a successful working partnership with Pile Master Ltd levelling foundation slabs for both residential homes and commercial businesses in the Canterbury region.

BBR Contech stays at the forefront of technology and maintains a high level of industry participation by membership and affiliations with the following organisations: