Case studies

SH 20 Motorway Extension, Auckland

SH 20 Motorway Extension - Bridge 4 SH 20 over North Island Main Trunk Rail Line.

Greymouth WWTP, West Coast

The Grey District Council’s new wastewater treatment plant in Greymouth is designed to receive, treat and manage wastewater from Greymouth, Cobden, Karoro and surrounding areas.

Oceania Dairy Ltd, Milk Powder Plant, Glenavy, South Canterbury

As part of a new $214M Milk Powder Plant near Glenavy South Canterbury, Main Contractor Ebert Construction Ltd engaged BBR Contech as the preferred specialist to design, supply and install a high-performing post-tensioned floor system for the Dryer area.

Pegasus Water Treatment Reservoir, North Canterbury

Brian Perry Civil won the Water Facilities contract for the new residential development known as Pegasus Town, 40 kilometers north of Christchurch at Woodend.

BBR Contech stays at the forefront of technology and maintains a high level of industry participation by membership and affiliations with the following organisations: