Case studies

Mt Victoria Tunnel - Anchors

If you’ve ever travelled between Wellington city and the airport, you’ve probably been through the Mt Victoria tunnel – and maybe even participated in the symphony of tooting horns that’s long been customary practice. With more than 620m to cover, there’s plenty of time to raise a tune!

New Office Development, Addington, Christchurch

A three-level commercial building overlooking Addington Raceway in Christchurch has been constructed using PRESSS technology and post-tensioned concrete shear walls, and includes replaceable energy dissipators and self-centring mechanisms.

North Shore Carpark - Post Tensioned Slab

The Waitemata District Health Board had a requirement for a multilevel car park to support its main North Shore Hospital located on the shores of Lake Pupuke.

Point Resolution Bridge, Auckland

“The view is stunning, the artwork is beautiful. The design is sleek, graceful and refreshing.”

BBR Contech stays at the forefront of technology and maintains a high level of industry participation by membership and affiliations with the following organisations: